MIGUEL   BERRAONDO

ELTHAM CINEMAS
Chapman Taylor

London (United Kingdon) 2016-2017


Cinemas and Restaurants

Leisure scheme developed by the Royal Borough of Greenwhich in London, with the intention of bringing new like to the heart of Eltham High St. 

The building comprises two restaurant at street level and a 6 screen multiplex cinema located at higher levels. A bar on the first floor also opens into the High Street. 

The design features brick facades on lower levels and rear of the building, matching the traditional construction of the suroundings, topped by two volumes cladded in backlit perforated metal panels which will glow in the evening ours. 

The scheme started construction in he first half of 2017 and construction is expected to last 18 months. 
DATA

Sector:      Leisure
£Area:           15,000 m²
Client:        Royal Borough of Greenwhich

Project Architect, developing tender, preconstruction and construction stages. 
ELTHAM
Published:

ELTHAM

Published:

Tools

Creative Fields