This project was a collaboration between Dystil under the owner, Miles Keller and Greyter Water Systems. The objective was to create a residential unit capable of processing all the greywater produced by the average family home. Cost, ease of assembly, size and ergonomics were the main concerns of the project. I was placed in charge of client-designer contact (in addition to my roll as part of the design team) and coordinated the relationship between engineers and designers.