The placement of the tree-shelving (seen in the two above visuals) are highlighted in orange on both floor plans 2 and 3.
The sectional detailed drawing displays how the 40x40 shelving rods will connect to the columns with the use of a floating shelf device. The device is held within the bricks and allows for nothing to show where adhesives are concerned.
Join Behance
Sign up or Sign into view personalized recommendations, follow creatives, and more.
or
Join Behance
Sign up or Sign in to view personalized recommendations, follow creatives, and more.
As a third year we took on our major projects, my major project was to transform the BT Shoreditch Exchange building - situated on Shoreditch Hig Read More