Pavel Bouse's profile

Nirwana Flat Housing


Nirwana Flat Housing
 
 

2014 | TU DELFT PROJECT
 
 
About
 
Five week project following the course of Building Technology. The task was to redesign an existing building in wooden variation according to suggested socio-economic concept.
 
 
 
ELEVATION. facade
 
 
SECTION. horizontal
 
 
SECTION VIEW. interior elevation
 
 
SECTION. vertical
 
 
SITE PLAN. Benoordenhoutseweg
 
 
 
 
 
SITE MODEL. building orientation
 
 
 
 
SITE MODEL. spatial context
CONSTRUCTION. concrete basement and core, load bearing beams and walls
CONSTRUCTION. cross-laminated timber slabs layout with cantilevers
CONSTRUCTION. plan layout, four apartments on each floor
CONSTRUCTION. cantilevering semiprivate balconies
NEW NIRWANA. external louvres, extensive green roof, solar thermal plant
 
 
 
 
 
WALL CONSTRUCTION. cross-grained dowelled timber element
 
 
 
 
 

 
 
STAIRCASE. CLT staircase assembly, Profilit double glazing
 
 
 
FACADE. assembly
 
 
 
 
 
FACADE. semiprivate balcony section
 
 
 

 
FACADE. window in CLT wall element
 
 
 
 
 
 

 
WINDOW. detail
 
 
 
 
 
 
 

 
FACADE. shading panels sliding along guide rails
 
 
 
 
FACADE. french window, lintel  spanning between CLT wall elements
 
 
 
 
 
FRENCH WINDOW. detail
 
 
Nirwana Flat Housing
Published:

Owner

Nirwana Flat Housing

Five week project following the course of Building Technology. The task was to redesign an existing building in wooden variation according to sug Read More

Published: