ankara hospıtal
Memorial Healthcare Investments

PROJECT STATUS
Completed

Area
42.000m2

Bed Capacity
230

Location
Ankara,Turkey



In the developing boulevards of Ankara, it was requested to design the tower as a hospital in the corner of a building block with two towers and outbuildings. However, due to the planning of the architecture of the building as an office, it caused quite difficult processes to be experienced.

          First of all, the stairs, shaft, entrance, exit and circulation sections of the building that are not suitable for the hospital have been completely overhauled and planning has been made. In the subsequent medical planning and project management processes, tower plans were created in a very challenging manner, and then the projects were finalized by making decisions on the patient bedroom, outpatient clinic and corridor samples of our units with our employer.

           Starting from the entrances of the building as a concept, the traces of the horizontal circulation determined to reach the functions with elevators and stairs have been the starting point as a thematic guide during sketches. It was brought together with the sense of space use.

           The still calm hardware on the floors and walls has taken its final form, with the electrical and mechanical elements in the ceilings equipped with elements in geometry suitable for the traces of the ceiling. The materials used were graphically supported outside of their details and forms, and with the feeling of being in a technological equipment and environment, it was intended to cost the patient a little more. It was desired to create confidence in the patient. With all these concept values, lighting, furniture, and other accessories used for visual support, the goal is to witness the contributions of the design with the patient's relaxation in the environment where he has already come to get the right and reliable service, contact with many healing details.





ANKARA HOSPITAL
Published:

Owner

ANKARA HOSPITAL

Published: