MOTORWAY A5 (B.Manastir-Osijek-Svilaj)
Bridge on river "Drava"
- 2.5 km long bridge
- bridge pylon
Foundation
- 850 bored piles (1500 mm)
There were two types of bored pile protection:
- under steel casing (piles under piers - depth 22-25 m in sand soil material)
- with bentonite slurry (piles under pylon - depth 37 m in sand soil material)
Drilling - Bauer BG 36
Drilling - Bauer BG 24 H and Casagrande C400
Concreting...
Finished piers with built reinforced beams...
Pit construction...
Station for bentonite slurry...
Bentonite slurry...
Drilling pile under bentonite slurry protection - Soilmec SR-80 C
Drilling pile under bentonite slurry protection - Soilmec SR-80 C
Benotonite slurry...
Today bride looks like this...
In the near future...