Oil&Gas Enhancement of North Pier Integrty

Enhancement Of Northen Pier MMA Project
- Location :   Kuwait City, Al- Ahmadi Mina District 
- Owner :      KCC , HOT , PSC
- Sponsors : KNPC 

Kuwait National Petroleum Company (KNPC) Carried out the study on the design life assessment of the shuaiba oil pier until 2036 through a consultant MS, AECOM, the study identified that the piles of the approach trestle and the north arm structures have insufficient reserve capacity to a safely sustain the design loads until 2036 , thus recommended repairs to several; areas to the existing piles including various preservations measures to be undertaken . The purpose of the scope is to carry out pile rehabilitation as per the repair recommendations  ​​​​​​​
- This slide shows the difference in  Cash flow Metric when construction and repair works are injected and mobilized by ground vehicle methods vs by ship maneuvering  , shows a increase in Earned value when Transportation is used by ships  
- KNPC also Planed to replace the fender system (fender body and frontal frames with its accessories like PEpads , Pad Fixing bolts , Frame fixing bolt, Chainsd and "U" anchors) for Berths 31 32 & 33  
Fig(1) Showing Activity (Plate Fit-up and Welding &TPI) in the northen arm 
Fig(2) Showing Activity (Protective paint of Grill Blasters & Coating of TPI) in Northen Arm Strong Point 
Fig(3) Showing Activity Parent ( Replacement of Old Fenders with TNK22 new Fenders ) in the Northen Arm  
The Video shows the sequencing of the the project focusing on the Steel Works in the Northen Arm 